DERBYSHIRE CONSERVATION VOLUNTEERS TASK REPORT |
|
Site: |
Tittesworth Reservoir |
Total Workdays: |
5 + 9 |
|||
|
Work Done For: |
Peak Park |
Date: |
22/1/2000 23/1/2000 |
|||
|
(type, quantity, quality, location) |
||||||
|
This weekend was a bumper outing for the group as we had seven on the Saturday and nine on Sunday. The task was split into several varied jobs; step building with railway sleepers and gravel adding chicken wire to boardwalks to improve the grip in the wet weather making two forestry gates using felled conifers and a lot of manual labour ! We were glad to have two new volunteers out with us, Steve and his daughter Stacy. It was nice to have a youngster on task for a change. It was also good fun to have a go at constructing the forestry gates which involved Dave the ranger felling several conifers (they needed thinning anyway) and us arranging them as two large gates. In addition to the good company the weekend was made more enjoyable by the weather which was dry and sunny although the wind was bitter. |
||||||
|
Volunteers on Task: |
Tools Used: |
|||||
|
Sat Chris, Steve and Stacy Gillingham, (Helen M., Helen S., Meriel, Susannah Beharall - 2 day)Sun Chris, Steve and Stacy Gillingham, Helen M., Helen S., Meriel, Susannah Beharall , Naomi, Colum |
bowsaws, spades, mattock, crow bar, |
|||||
|
Mileage: Drivers: |
36 Chris, Susannah, Helen S |
|||||
|
Total Volunteers: 7, 9 |
||||||
|
Task Report List Back to Main Page | ||||||